| (a) | Examination of and report on a steam boiler when cold where the heating surface is — |
|
| |
| |
| (ii) | more than 5 sq.m. but not more than 10 sq.m. |
|
| |
| (iii) | more than 10 sq.m. but not more than 25 sq.m. |
|
| |
| (iv) | more than 25 sq.m. but not more than 50 sq.m. |
|
| |
| (v) | more than 50 sq.m. but not more than 100 sq.m. |
|
| |
| (vi) | more than 100 sq.m. but not more than 250 sq.m. |
|
| |
| (vii) | more than 250 sq.m. but not more than 1,000 sq.m. |
|
| |
| (viii) | more than 1,000 sq.m. |
|
| |
| (b) | Hydrostatic test on a steam boiler where the heating surface is — |
|
| |
| |
| (ii) | more than 5 sq.m. but not more than 10 sq.m. |
|
| |
| (iii) | more than 10 sq.m. but not more than 25 sq.m. |
|
| |
| (iv) | more than 25 sq.m. but not more than 50 sq.m. |
|
| |
| (v) | more than 50 sq.m. but not more than 100 sq.m. |
|
| |
| (vi) | more than 100 sq.m. but not more than 250 sq.m. |
|
| |
| (vii) | more than 250 sq.m. but not more than 1,000 sq.m. |
|
| |
| (viii) | more than 1,000 sq.m. |
|
| |
| (c) | Inspection of the layout of a steam boiler prior to registration |
|
| |
| (d) | Inspection while a steam boiler is being installed |
|
| |
| (e) | Inspection while a steam boiler is under steam pressure |
|
| |
| (f) | Inspection of a damaged steam boiler to determine nature of repair |
|
| |
| (g) | Inspection of materials to be used for repair of a steam boiler |
|
| |
| (h) | Inspection while a steam boiler is being repaired |
|
| |
| |
| (a) | Examination of and report on a superheater when cold where the heating surface is — |
|
| |
| (i) | not more than 50 sq.m. |
|
| |
| (ii) | more than 50 sq.m. but not more than 1,000 sq.m. |
|
| |
| (iii) | more than 1,000 sq.m. |
|
| |
| (b) | Hydrostatic test on a superheater where the heating surface is — |
|
| |
| (i) | not more than 50 sq.m. |
|
| |
| (ii) | more than 50 sq.m. but not more than 1,000 sq.m. |
|
| |
| (iii) | more than 1,000 sq.m. |
|
| |
| (c) | Inspection of a superheater prior to registration |
|
| |
| (d) | Inspection while a superheater is being installed |
|
| |
| (e) | Inspection while a superheater is under steam pressure |
|
| |
| (f) | Inspection of a damaged superheater to determine nature of repair |
|
| |
| (g) | Inspection of materials to be used for repair of a superheater |
|
| |
| (h) | Inspection while a superheater is being repaired |
|
| |
| |
| (a) | Examination of and report on an economiser when cold where the heating surface is — |
|
| |
| (i) | not more than 50 sq.m. |
|
| |
| (ii) | more than 50 sq.m. but not more than 1,000 sq.m. |
|
| |
| (iii) | more than 1,000 sq.m. |
|
| |
| (b) | Hydrostatic test on an economiser where the heating surface is — |
|
| |
| (i) | not more than 50 sq.m. |
|
| |
| (ii) | more than 50 sq.m. but not more than 1,000 sq.m. |
|
| |
| (iii) | more than 1,000 sq.m. |
|
| |
| (c) | Inspection of the layout of an economiser prior to registration |
|
| |
| (d) | Inspection while an economiser is being installed |
|
| |
| (e) | Inspection while an economiser is under steam pressure |
|
| |
| (f) | Inspection of a damaged economiser to determine nature of repair |
|
| |
| (g) | Inspection of materials to be used for repair of an economiser |
|
| |
| (h) | Inspection while an economiser is being repaired |
|
| |
| 4. | Cast-iron underfired vulcaniser. |
|
| |
| (a) | Examination of and report on an underfired vulcaniser when cold |
|
| |
| (b) | Hydrostatic test on an underfired vulcaniser |
|
| |
| (c) | Inspection of the layout of an underfired vulcaniser prior to registration |
|
| |
| (d) | Inspection while an underfired vulcaniser is being installed |
|
| |
| (e) | Inspection while an underfired vulcaniser is under steam pressure |
|
| |
| (f) | Inspection of a damaged underfired vulcaniser to determine nature of repair |
|
| |
| (g) | Inspection of materials to be used for repair of an underfired vulcaniser |
|
| |
| (h) | Inspection while an underfired vulcaniser is being repaired |
|
| |
| |
| (a) | Examination of and report on an air receiver |
|
| |
| (b) | Hydrostatic test on an air receiver |
|
| |
| (c) | Inspection while an air receiver is being installed |
|
| |
| (d) | Inspection while an air receiver is in operation to determine the operation of the safety valves and other fittings or attachments necessary for the safe working of the air receiver |
|
| |
| (e) | Inspection of a damaged air receiver to determine nature of repair |
|
| |
| (f) | Inspection of materials to be used for repair of an air receiver |
|
| |
| (g) | Inspection while an air receiver is being repaired |
|
| |
| |
| (a) | Examination of and report on a steam receiver |
|
| |
| (b) | Hydrostatic test on a steam receiver |
|
| |
| (c) | Inspection while a steam receiver is being installed |
|
| |
| (d) | Inspection of a steam receiver while in operation to determine the operation of the safety valves and other fittings or attachments necessary for the safe working of the steam receiver |
|
| |
| (e) | Inspection of a damaged steam receiver to determine nature of repair |
|
| |
| (f) | Inspection of materials to be used for repair of a steam receiver |
|
| |
| (g) | Inspection while a steam receiver is being repaired |
|
| |
| 7. | Refrigerating plant pressure receiver. |
|
| |
| (a) | Examination of and report on a refrigerating plant pressure receiver |
|
| |
| (b) | Hydrostatic test on a refrigerating plant pressure receiver |
|
| |
| (c) | Inspection while a refrigerating plant pressure receiver is being installed |
|
| |
| (d) | Inspection of a refrigerating plant pressure receiver while it is in operation to determine the operation of the safety valves and other fittings or attachments necessary for the safe working of the pressure receiver |
|
| |
| (e) | Inspection of a damaged refrigerating plant pressure receiver to determine nature of repair |
|
| |
| (f) | Inspection of materials to be used for repair of a refrigerating plant pressure receiver |
|
| |
| (g) | Inspection while a refrigerating plant pressure receiver is being repaired |
|
| |
| 8. | Non-destructive tests of any pressure vessel. |
|
| |
| (a) | Ultrasonic thickness measurement test |
|
| |
| |
| |
| | Surveys of any number of pressure vessels while they are being constructed |
|
| | 100 per hour or part thereof (excluding travelling time). |
|
| |
| | Basic fee payable for each visit in addition to fees payable under paragraphs 1 to 9 |
|
| |
| |
| | When after notice given by an authorised boiler inspector the pressure vessel is not ready for examination or inspection on the date and time stated on the notice, for each extra visit |
|
| |
| |
| (a) | Approval of design of a new steam boiler to be built in Singapore or of a steam boiler with a new design imported into Singapore and having a recognised certification, where the heating surface is — |
|
| |
| (i) | not more than 10 sq.m. |
|
| |
| (ii) | more than 10 sq.m. but not more than 250 sq.m. |
|
| |
| |
| (b) | Approval of design of any unfired pressure vessel or underfired vulcaniser |
|
| |
| |
| | Investigation prior to approval of a steam boiler without recognised certification in addition to inspection or examination fee, where the heating surface is — |
|
| |
| (a) | not more than 10 sq.m. |
|
| |
| (b) | more than 10 sq.m. but not more than 250 sq.m. |
|
| |
| (c) | more than 250 sq.m. but not more than 1,000 sq.m. |
|
| |
| |
| 14. | Repair of pressure vessel. |
|
| |
| | For approval of written procedure for extensive repairs of a steam boiler, superheater, economiser, underfired vulcaniser or an unfired pressure vessel |
|
| |
| 14A. | Steam Piping Inspection |
|
| |
| | Inspection of steam piping exceeding 5 m in length and 150 mm in diameter |
|
| |
| 14B. | Extension of Pressure Vessels inspection intervals |
|
| |
| | Processing of application for the extension of inspection intervals of pressure vessels for 6 months or longer |
|
| |
| 15. | Hoists, lifts and other lifting equipment. |
|
| |
| | Examination of hoist, lift, lifting appliance and lifting machine |
|
| | Fees to be determined by the Chief Inspector or by some other person duly authorised by him. |
|
| 16. | Type of approval of lifting equipment |
|
| |
| (a) | Type of approval of a model lifting equipment |
|
| |
| (b) | Revision of type approval of a model of lifting equipment |
|
| |