Source: Singapore Statutes Online | Archived by Legal Wires
| Rapid Transit Systems Act |
| Rapid Transit Systems (Creation of Rights) Notification 2018 |
|
| Citation |
| 1. This Notification is the Rapid Transit Systems (Creation of Rights) Notification 2018. |
| Powers of Authority |
| 2. The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as Downtown Line Stage 1 for Bugis MRT Station, enter upon the railway area in the land described as TS13 Lot 01115N pts (called in this Notification the specified land) and exercise such rights as are described in the Schedule in, under or over the railway area in the specified land. |
| Inspection of plan |
3. A copy of the plan of the railway area in the specified land is available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
|
| THE SCHEDULE |
| Paragraph 2 |
| 1. The uninterrupted right to pass and repass with trains along any railway tunnel constructed on or under the specified land for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto. |
| 2. The right of uninterrupted passage with or without vehicles for the purpose of access to and egress from any railway premises constructed on or under the specified land or any other land adjoining thereto. |
| 3. The right at all times to have any structure constructed by the Authority on or under the specified land for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such land. |
Chairman, Land Transport Authority of Singapore. |
| [LTA/JL/DT/RTSA/S6/L18.030.002.12/2017; AG/LEGIS/SL/263A/2015/2 Vol. 2] |
Archived for legal research. Authoritative version at sso.agc.gov.sg.