Rapid Transit Systems (Creation of Rights) (No. 8) Notification 2013

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 655
Rapid Transit Systems Act
(CHAPTER 263A)
Rapid Transit Systems
(Creation of Rights) (No. 8)
Notification 2013
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act, the Land Transport Authority of Singapore hereby makes the following Notification:
Citation
1.  This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 8) Notification 2013.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as Downtown Line 1 from Upper Cross Street to Rochor Road (serving Chinatown, Telok Ayer, Downtown, Bayfront, Promenade and Bugis MRT Stations), enter upon the railway areas in the lands described in the First Schedule and exercise such rights as are described in the Second Schedule in, under or over those areas of the lands.
Inspection of plans
3.  Copies of the plans of the railway areas in the lands described in the First Schedule shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
(a)between 9 a.m. and 5 p.m. of any day from Monday to Friday (except public holidays); but
(b)if any such day is the eve of the New Year, Lunar New Year or Christmas, between 9 a.m. and 12 noon.
FIRST SCHEDULE
Paragraphs 2 and 3 and Second Schedule
Lot Nos.
Town Subdivision (TS)
 
00505W pt
TS 06
 
00404P pt
TS 06
 
00106C pt
TS 02
 
00593V pt
TS 01
 
00297W pt
TS 30
 
80007C pt
TS 30
 
80006L pt
TS 30
 
00544T pt
TS 11
 
00904X pts
TS 11
 
01115N pt
TS 13
 
80001W pt
TS 13
 
00899T pt
TS 13.
SECOND SCHEDULE
Paragraph 2
1.  The uninterrupted right to pass and repass with trains along any railway tunnel constructed under any of the lands described in the First Schedule for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto.
2.  The right of uninterrupted passage with or without vehicles for the purpose of access and egress to and from any railway premises constructed on or under any of the lands described in the First Schedule or any other land adjoining thereto.
3.  The right at all times to have any structure constructed by the Authority on or under any of the lands described in the First Schedule for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such lands.
Made this 11th day of October 2013.
MICHAEL LIM CHOO SAN
Chairman,
Land Transport Authority of Singapore.
[LTA/BD/EW/RTSA-L18.030.002.S6.05; AG/LLRD/SL/263A/2010/2 Vol. 3]

Archived for legal research. Authoritative version at sso.agc.gov.sg.