Source: Singapore Statutes Online | Archived by Legal Wires
| Rapid Transit Systems Act |
| Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2006 |
|
| Citation and commencement |
| 1. This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2006 and shall come into operation on 5th September 2006. |
| Powers of Authority |
| 2. The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway, enter upon the railway areas in the land described as TS11 Lot 00482M pt (referred to in this Notification as the specified land) and exercise such rights as are described in the Schedule in, under or over the area of land. |
| Inspection of plan |
| 3. A copy of the plan of the railway areas in the specified land shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 between 9 a.m. and 5 p.m. from Mondays to Fridays (public holidays excepted). |
| THE SCHEDULE |
| Paragraph 2 |
| 1. The right of uninterrupted passage without vehicles for the purpose of access and egress to and from any railway premises constructed on, above or under the specified land or any other land adjoining thereto. |
| 2. The right at all times to have any structure constructed by the Authority on, above or under the specified land for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such land. |
Made this 30th day of August 2006.
Chairman, Land Transport Authority of Singapore. |
| [LTA/EK/IE/RTSA-S6/4/06; AG/LEG/SL/263A/2003/1 Vol. 3] |
Archived for legal research. Authoritative version at sso.agc.gov.sg.