Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2008

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 335
Rapid Transit Systems Act
(Chapter 263A)
Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2008
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act, the Land Transport Authority of Singapore hereby makes the following Notification:
Citation
1.  This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2008.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway, enter upon the railway areas in the lands described in the First Schedule and exercise such rights as are described in the Second Schedule in, under or over those areas of lands.
Inspection of plan
3.  Copies of the plans of the railway areas in the lands described in the First Schedule shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 on any day from Monday to Friday (except public holidays) ––
(a)between 9 a.m. and 12 noon if the day is New Year’s eve, Christmas eve or the eve of the Lunar New Year; and
(b)between 9 a.m. and 5 p.m. of any such day.
FIRST SCHEDULE
Paragraphs 2 and 3 and Second Schedule
Lot Nos.
 
MK
06700L pt
 
MK24
07489T pt
 
MK24
07490V pt
 
MK24
07491P pt
 
MK24
07492T pt
 
MK24
07493A
 
MK24
07494K
 
MK24
07495N pt
 
MK24
07496X pt
 
MK24
07497L pt
 
MK24
05740K pt
 
MK24
09247L pt
 
MK24
09249M pt
 
MK24
09606W pt
 
MK24
06907C pt
 
MK24
06758X pt
 
MK24
06470W pt
 
MK24
08432T pt
 
MK24
08433A pt
 
MK24
05577N pt
 
MK24
05228T pt
 
MK24
05229A pt
 
MK24
06693W pt
 
MK24
09269P pt
 
MK24
09268V pt
 
MK24
05253L pt
 
MK24
06694V
 
MK24
05579L
 
MK24
05960P
 
MK24
07767W pt
 
MK24
07768V pt
 
MK24
07769P pt
 
MK24
07770W pt
 
MK24
05957P pt
 
MK24
05958T pt
 
MK24
07274L pt
 
MK24
07275C pt
 
MK24
08989L pt
 
MK24
06999L pt
 
MK24
06469P pt
 
MK17
11311N pt
 
MK18
11312X pt
 
MK18
11315M pt
 
MK18
11580A pt
 
MK18
13157C pt
 
MK18
13183A pt
 
MK18
16257W pt
 
MK18
16743X pt
 
MK18
16739N pt
 
MK18
16740A pt
 
MK18
16582X pt
 
MK18
11352P pt
 
MK18
12215W pt
 
MK18
10561A pt
 
MK18
07310A pt
 
MK18
07311K pt
 
MK18
07312N pt
 
MK18
07313X pt
 
MK18
07314L pt
 
MK18
16332W pt
 
MK18
07372A pt
 
MK18
07373K pt
 
MK18
07374N pt
 
MK18
12281V pt
 
MK18
16263T pt
 
MK18
15673W pt
 
MK18
06106W pt
 
MK18
06107V pt
 
MK18
08093A pt
 
MK18
08094K pt
 
MK18
08095N pt
 
MK18
07662M pt
 
MK18
08100V pt
 
MK18
08101P pt
 
MK18
08102T pt
 
MK18
08103A pt
 
MK18
08104K pt
 
MK18
07659M pt
 
MK18
07660L pt
 
MK18
07661C pt
 
MK18
07664V pt
 
MK18
07665P pt
 
MK18
07666T pt
 
MK18
07667A pt
 
MK18
99986A pt
 
MK18
99987K pt
 
MK18
99978M pt
 
MK18
99988N pt
 
MK18
99977C pt
 
MK18
99976L pt
 
MK18
14092W pt
 
MK18
99975X pt
 
MK18
99990K pt
 
MK18
99991N pt
 
MK18
99974N pt
 
MK18
99952V pt
 
MK18
99953P pt
 
MK18
99954T pt
 
MK18
99955A pt
 
MK18
99956K pt
 
MK18
99957N pt
 
MK18
99958X pt
 
MK18
99967P pt
 
MK18
99966V pt
 
MK18
99965W pt
 
MK18
99964M pt
 
MK18
99905P pt
 
MK18
99970P
 
MK18
99968T pt
 
MK18
99969A pt
 
MK18
16564N pt
 
MK18
16565X pt
 
MK18
16566L pt
 
MK18
16567C pt
 
MK18
13031T pt
 
MK18
15739L pt
 
MK18
15740N pt
 
MK18
16542V pt
 
MK18
16541W pt
 
MK18
07308K pt
 
MK18
07309N pt
 
MK18
07305P pt
 
MK18
07304V pt
 
MK18
07307A pt
 
MK18
16726X pt
 
MK18
06090K pt
 
MK18
06091N pt
 
MK18
06092X pt
 
MK18
06093L pt
 
MK18
06094C pt
 
MK18
06095M pt
 
MK18
06096W pt
 
MK18
06097V pt
 
MK18
08077K pt
 
MK18
08076A pt
 
MK18
08081N pt
 
MK18
08078N pt
 
MK18
08079X pt
 
MK18
08074P pt
 
MK18
08075T pt
 
MK18
08082X pt
 
MK18
08083L pt
 
MK18
08084C pt
 
MK18
08080K pt
 
MK18
08088P pt
 
MK18
08087V pt
 
MK18
08044T pt
 
MK18
08043P pt
 
MK18
08042V pt
 
MK18
08045A pt
 
MK18
08046K pt
 
MK18
08047N pt
 
MK18
08053C pt
 
MK18
08054M pt
 
MK18
08055W pt
 
MK18
08056V pt
 
MK18
08057P pt
 
MK18
08058T pt
 
MK18
08059A pt
 
MK18
08060P pt
 
MK18
08061T pt
 
MK18
08062A pt
 
MK18
08112M pt
 
MK18
08063K pt
 
MK18
08064N pt
 
MK18
12882N pt
 
MK18
10675V pt
 
MK18
13695C pt
 
MK18
16361C pt
 
MK18
16363W pt
 
MK18
16536C pt
 
MK18
13655T pt
 
MK18
SECOND SCHEDULE
Paragraph 2
1.  The uninterrupted right to pass and repass with trains —
(a)along any railway tunnel constructed under any of the lands described in the First Schedule; and
(b)along any railway viaduct constructed above any of the lands described in the First Schedule,
for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto.
2.  The right of uninterrupted passage without vehicles for the purpose of access and egress to and from any railway premises constructed on, above or under any of the lands described in the First Schedule or any other land adjoining thereto.
3.  The right at all times to have any structure constructed by the Authority on, above or under the lands described in the First Schedule for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such lands.

Made this 13th day of June 2008.

MICHAEL LIM CHOO SAN
Chairman,
Land Transport Authority of Singapore.
[LTA/EK/AN/RTSA-S6.08.04; AG/LEG/SL/263A/2003/1 Vol. 5]

Archived for legal research. Authoritative version at sso.agc.gov.sg.