Rapid Transit Systems (Creation of Rights) Notification 2023

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 269
Rapid Transit Systems Act 1995
Rapid Transit Systems
(Creation of Rights)
Notification 2023
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act 1995, the Land Transport Authority of Singapore makes the following Notification:
Citation
1.  This Notification is the Rapid Transit Systems (Creation of Rights) Notification 2023.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as Thomson‑East Coast Line, enter upon the railway area in the lands described in the First Schedule and exercise such rights as are described in the Second Schedule in, under or over the railway area in those lands.
Inspection of plan
3.  A copy of the plan of the railway area in the lands described in the First Schedule is available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
(a)between 9 a.m. and 5 p.m. of any day from Monday to Friday (except public holidays); but
(b)if any such day is the eve of the New Year, Lunar New Year or Christmas, between 9 a.m. and 12 noon.
FIRST SCHEDULE
Paragraphs 2 and 3 and
Second Schedule
Lot Nos.
Mukim (MK)
05558K pt
MK25
96483W pt
MK25
05563X pt
MK25
04852T pt
MK25
06028L pt
MK25
06029C pt
MK25
07074A pt
MK25
06239M pt
MK25
06238C pt
MK25
04738C pt
MK25
03665M pt
MK25
04319L pt
MK25
96994A pt
MK25
96993T pt
MK25
05634N pt
MK25
05632A pt
MK25
07229V pt
MK25
07230M pt
MK25
00710N pt
MK25
03276L pt
MK25
07404C pt
MK25
03078K pt
MK25
04735N pt
MK25
03834A pt
MK25
07367P pt
MK25
06852M pt
MK25
09858W pts
MK26
09499L pt
MK26
10267C
MK26
10268M
MK26
10266L pts
MK26
11016W pt
MK27
04628X pt
MK27
06104W pt
MK27
06108A pt
MK27
SECOND SCHEDULE
Paragraph 2
1.  The uninterrupted right to pass and repass with trains along any railway tunnel constructed on or under the lands described in the First Schedule for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto.
2.  The right of uninterrupted passage with or without vehicles for the purpose of access to and egress from any railway premises constructed on or under the lands described in the First Schedule or any other land adjoining thereto.
3.  The right at all times to have any structure constructed by the Authority on or under the lands described in the First Schedule for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such lands.
Made on 26 April 2023.
CHAN HENG LOON ALAN
Chairperson,
Land Transport Authority of Singapore.
[LTA/L18.030.002; AG/LEGIS/SL/263A/2020/3 Vol. 2]

Archived for legal research. Authoritative version at sso.agc.gov.sg.