Rapid Transit Systems (Creation of Rights) (No. 5) Notification 2010

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 233
Rapid Transit Systems Act
(Chapter 263A)
Rapid Transit Systems (Creation of Rights) (No. 5) Notification 2010
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act, the Land Transport Authority of Singapore hereby makes the following Notification:
Citation
1.  This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 5) Notification 2010.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as Circle Line from Old Airport Road to Bartley Road, enter upon the railway areas in the lands specified in the First Schedule and exercise such rights as are described in the Second Schedule in, under or over those area of those land.
Inspection of plans
3.  Copies of the plans of the railway areas in the lands described in the First Schedule shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
(a)between 9 a.m. and 5 p.m. of any day from Monday to Friday (except public holidays); but
(b)if any such day is the eve of the New Year, Lunar New Year or Christmas, between 9 a.m. and 12 noon.
FIRST SCHEDULE
Paragraphs 2 and 3 and Second Schedule
Lot Nos.
 
Mukim (MK)
06470M pt
 
MK23
00065W pt
 
MK24
00884W pt
 
MK24
00885V pt
 
MK24
00886P pt
 
MK24
00887T pt
 
MK24
00888A pt
 
MK24
00889K pt
 
MK24
00890T pt
 
MK24
00891A pt
 
MK24
00892K pt
 
MK24
00893N pt
 
MK24
00894X pt
 
MK24
00895L pt
 
MK24
00896C pt
 
MK24
00897M pt
 
MK24
00898W pt
 
MK24
00899V pt
 
MK24
00900T pt
 
MK24
02358K
 
MK24
02359N
 
MK24
02360A
 
MK24
02361K
 
MK24
02362N
 
MK24
02363X
 
MK24
02364L
 
MK24
02365C
 
MK24
02366M pt
 
MK24
02367W pt
 
MK24
02368V pt
 
MK24
02536K pt
 
MK24
02537N pt
 
MK24
02538X pt
 
MK24
02539L pt
 
MK24
02540N pt
 
MK24
02541X pt
 
MK24
02542L pt
 
MK24
02606T pt
 
MK24
02607A pt
 
MK24
02608K pt
 
MK24
05901K pt
 
MK24
07429K pt
 
MK24
08933W pt
 
MK24
09953V pt
 
MK24
10094C pt
 
MK24
10160T pt
 
MK24
96006P pt
 
MK24
96007T pt
 
MK24
96008A pt
 
MK24
96009K pt
 
MK24
96010T pt
 
MK24
96011A pt
 
MK24
96012K pt
 
MK24
96013N pt
 
MK24
01040P pt
 
MK25
01234A pt
 
MK25
01282A pt
 
MK25
01644M pt
 
MK25
02424W pt
 
MK25
03255A pt
 
MK25
03256K pt
 
MK25
03397C pt
 
MK25
03398M pt
 
MK25
03606P pt
 
MK25
03651M pt
 
MK25
04253W pt
 
MK25
04303N pt
 
MK25
04638V pt
 
MK25
04639P pt
 
MK25
05485A pt
 
MK25
05624M pt
 
MK25
05868T pt
 
MK25
05987P pt
 
MK25
05988T pt
 
MK25
06158A pt
 
MK25
06533N pt
 
MK25
06663P pt
 
MK25
06667N pt
 
MK25
06873T pt
 
MK25
06946A pt
 
MK25
07007P pt
 
MK25
99233C pt
 
MK25
99237P pt
 
MK25
99238T pt
 
MK25
99250C pt
 
MK25
99267V pt
 
MK25
99269T pt
 
MK25
99272T pt
 
MK25
SECOND SCHEDULE
Paragraph 2
1.  The uninterrupted right to pass and repass with trains along any railway tunnels constructed under any of the lands described in the First Schedule for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto.
2.  The right of uninterrupted passage with or without vehicles for the purpose of access and egress to and from any railway premises constructed on or under any of the lands described in the First Schedule or any other land adjoining thereto.
3.  The right at all times to have any structure constructed by the Authority on or under the lands described in the First Schedule for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such lands.

Made this 15th day of April 2010.

MICHAEL LIM CHOO SAN
Chairman,
Land Transport Authority of Singapore.
[LTA/EK/EW/RTSA-S6.10.05; AG/LLRD/SL/263A/2010/2 Vol. 1]

Archived for legal research. Authoritative version at sso.agc.gov.sg.