Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2017

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 184
Rapid Transit Systems Act
(CHAPTER 263A)
Rapid Transit Systems
(Creation of Rights) (No. 4)
Notification 2017
In exercise of the powers conferred by section 6 of the Rapid Transit Systems Act, the Land Transport Authority of Singapore makes the following Notification:
Citation
1.  This Notification is the Rapid Transit Systems (Creation of Rights) (No. 4) Notification 2017.
Powers of Authority
2.  The Authority or any person authorised by the Authority may, at any reasonable time and for the purposes of and incidental to the operation of the railway known as Circle Line for Paya Lebar MRT Station, enter upon the railway area in the lands described in the First Schedule and exercise such rights as are described in the Second Schedule in, under or over the railway area in those lands.
Inspection of plans
3.  Copies of the plans of the railway area in the lands described in the First Schedule are available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 —
(a)between 9 a.m. and 5 p.m. of any day from Monday to Friday (except public holidays); but
(b)if any such day is the eve of the New Year, Lunar New Year or Christmas, between 9 a.m. and 12 noon.
FIRST SCHEDULE
Paragraphs 2 and 3 and Second Schedule
Lot Nos.
Mukim (MK)
07373T pt
MK 23
06991M pt
MK 23
SECOND SCHEDULE
Paragraph 2
1.  The uninterrupted right to pass and repass with trains along any railway premises constructed on or under the lands described in the First Schedule for the purpose of the carriage of passengers by train and for all purposes necessary and incidental thereto.
2.  The right of uninterrupted passage with or without vehicles for the purpose of access to and egress from any railway premises constructed on or under the lands described in the First Schedule or any other land adjoining thereto.
3.  The right at all times to have any structure constructed by the Authority on, above or under the lands described in the First Schedule for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such lands.
Made on 19 April 2017.
CHAN HENG LOON ALAN
Chairman,
Land Transport Authority of Singapore.
[LTA/JL/NJ/RTSA/S6/L18.030.002.02/2016; AG/LEGIS/SL/263A/2015/2 Vol. 1]

Archived for legal research. Authoritative version at sso.agc.gov.sg.