Source: Singapore Statutes Online | Archived by Legal Wires
| Rapid Transit Systems Act |
| Rapid Transit Systems (Creation of Rights) (No. 2) Notification 2008 |
|
| Citation |
| 1. This Notification may be cited as the Rapid Transit Systems (Creation of Rights) (No. 2) Notification 2008. |
| Powers of Authority |
| Inspection of plan |
3. A copy of the plan of the railway area in the specified land shall be available for inspection by the public free of charge at the office of the Land Transport Authority of Singapore at 1 Hampshire Road, Singapore 219428 on any day from Monday to Friday (except public holidays) —
|
| THE SCHEDULE |
| Paragraph 2 |
1. The uninterrupted right to pass and repass with trains —
|
| 2. The right of uninterrupted passage without vehicles for the purpose of access and egress to and from any railway premises constructed on, above or under any of the specified land or any other land adjoining thereto. |
| 3. The right at all times to have any structure constructed by the Authority on, above or under the specified land for the operation of the Rapid Transit System supported, upheld and maintained by the soil and subsoil of such land. |
Made this 29th day of February 2008.
Chairman, Land Transport Authority of Singapore. |
| [LTA/EK/AN/RTSA-S6.08.02; AG/LEG/SL/263A/2003/1 Vol. 4] |
Archived for legal research. Authoritative version at sso.agc.gov.sg.