Railways (Level Crossings Gates) Order

Source: Singapore Statutes Online | Archived by Legal Wires


Railways Act
(Chapter 263, Section 17(3))
Railways (Level Crossings Gates) Order
O 1
G.N. No. S 196/1965

REVISED EDITION 1990
(25th March 1992)
[19th November 1965]
Citation
1.  This Order may be cited as the Railways (Level Crossings Gates) Order.
Gates to be kept closed
2.  The gates mentioned in the Schedule shall be installed at the railway level crossings at the Jurong Industrial Estate and shall be kept closed against the road instead of against the railway when engines or carriages pass along the railway.
THE SCHEDULE
(a)Gates on the sides of Jurong Port Road at the point where the railway crosses the road.
(b)Gates on the sides of Pioneer Road at the point where the railway crosses the road.
(c)Gates on the sides of the new road (unnamed) running between the Mobil Refinery Company Malaysia Limited and Asia Cement (Malaysia) Limited at the point where the railway crosses the road.
(d)Gates on the sides of Jalan Terusan at the point where the railway crosses the road.
(e)Gates on the sides of Jalan Buroh where the railway crosses the road.
(f)Gates on the sides of Jalan Tepong where the railway crosses the road.
(g)Gates on the sides of Jalan Buroh where the railway crosses the road.

LEGISLATIVE HISTORY

Railways (Level Crossings Gates) Order

 

This Legislative History is provided for the convenience of users of the Railways (Level Crossings Gates) Order. It is not part of this Order.
1.  
G. N. No. S 196/1965—Railways (Level Crossings Gates) Order 1965
Date of commencement
:
19 November 1965

Archived for legal research. Authoritative version at sso.agc.gov.sg.