Protected Areas (No. 7) Order 2003

Source: Singapore Statutes Online | Archived by Legal Wires


No. S 312
Protected Areas and Protected Places Act
(Chapter 256)
Protected Areas (No. 7) Order 2003
In exercise of the powers conferred by section 4(1) of the Protected Areas and Protected Places Act, the Minister for Home Affairs hereby makes the following Order:
Citation and commencement
1.  This Order may be cited as the Protected Areas (No. 7) Order 2003 and shall come into operation on 30th June 2003.
Premises declared to be protected area
2.  The area described in the second column of the Schedule is hereby declared to be a protected area for the purposes of the Act, and every person who is in that area shall comply with such directions for regulating his movement and conduct as may be given by an authorised officer.
THE SCHEDULE
First column
 
Second column
The Authority
 
Protected Area
Assistant Chief of the
General Staff (Training)
G6 Army
 
TRAINING PLOT 2B.
 
 
All that area comprised in Lots 383P, 671N and 672X in Mukim No. 9 occupied by “TRAINING PLOT 2B” containing an area of about 19,682 square metres and bounded approximately as follows:
 
 
Commencing at a point which is 38,191.360 metres North and 12,533.588 metres East of the Singapore Land Authority origin of co-ordinates (30,000 metres North, 30,000 metres East), the boundaries run along successive lines of bearings and distances approximately as follows:
 
 
Bearing
 
Distance in metres
 
 
166° 53’ 00"
 
201.550
 
 
203° 31’ 00"
 
8.594
 
 
203° 31’ 00"
 
7.217
 
 
203° 31’ 00"
 
11.664
 
 
203° 31’ 00"
 
75.926
 
 
340° 31’ 28"
 
10.166
 
 
339° 40’ 52"
 
11.884
 
 
341° 38’ 47"
 
20.213
 
 
339° 17’ 19"
 
18.166
 
 
350° 35’ 24"
 
15.983
 
 
343° 33’ 22"
 
9.953
 
 
347° 31’ 00"
 
24.836
 
 
336° 55’ 06"
 
6.347
 
 
336° 55’ 06"
 
11.653
 
 
336° 55’ 06"
 
4.000
 
 
332° 58’ 01"
 
26.311
 
 
340° 18’ 50"
 
69.792
 
 
261° 40’ 13"
 
0.985
 
 
340° 45’ 32"
 
70.341
 
 
82° 10’ 00"
 
9.747
 
 
82° 10’ 00"
 
8.059
 
 
85° 09’ 00"
 
77.554
 
 
to the point of commencement.
 
 
The boundaries of “TRAINING PLOT 2B” are more particularly delineated on the Survey Plan No. 127/BDYG/004A filed in the office of the Director, Building and Infrastructure, Defence Science and Technology Agency, Singapore.
UNKNOWN

Made this 17th day of June 2003.

TAN GUONG CHING
Permanent Secretary,
Ministry of Home Affairs,
Singapore.
[DSTA BI/4-2-62; MHA(PS) 12/2/01 TF 7; AG/LEG/SL/256/2002/1 Vol. 2]

Archived for legal research. Authoritative version at sso.agc.gov.sg.