| |
|---|
| |
|---|
Assistant Chief of General Staff (Training) |
| | TRAINING PLOT 9 — PULAU TEKONG. |
| All that area comprised in Land Lot 502L in Mukim No. 3 occupied by “TRAINING PLOT 9 — PULAU TEKONG” containing an area of about 1,824,179.9 square metres and bounded approximately as follows: |
| | | Commencing at a point 41,465.614 metres North and 55,372.353 metres East of the Singapore Land Authority SVY 21 Datum, the boundaries run along successive lines of coordinates approximately as follows: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | to the point of commencement. |
| | | The boundaries of “TRAINING PLOT 9 — PULAU TEKONG” are more particularly delineated on the Survey Plan No. GAZ902 filed in the office of the Director, Building and Infrastructure, Defence Science and Technology Agency, Singapore. |
|
|