| | | | | | Managing Director, SP PowerGrid Ltd |
| | (1) 400 KV SUBSTATION AT LABRADOR, SINGAPORE. |
| | | | All that area comprised in part of State Land Lot 3708A in Mukim No. 3 occupied by “400 KV SUBSTATION AT LABRADOR, SINGAPORE” containing an area of about 23,607.21 square metres and bounded approximately as follows: |
| | | | Commencing at the corner of the aforesaid “400 KV SUBSTATION AT LABRADOR, SINGAPORE” which point is 28,319.949 metres North and 24,136.795 metres East of the Singapore Land Authority SVY 21 Datum, the boundaries run along successive lines of co-ordinates approximately as follows: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | to the point of commencement. |
| | | | The boundaries of “400 KV SUBSTATION AT LABRADOR, SINGAPORE” are more particularly delineated in the Plan set out below. |
|
|