| |
|---|
| | | (2) | S 226/95 [19.5.95] S3, 29 SIB |
|
| | All that area comprised in part of State Land Lot 90-6, MUKIM NO. 23 (PAYA LEBAR) occupied by “KAKI BUKIT CAMP I” containing an area of about 6,000 square metres and bounded approximately as follows: |
| Commencing at the northwestern-most corner of the perimeter fence of the aforesaid “KAKI BUKIT CAMP I” which point is 35,770.3 metres North and 36,158.4 metres East of the Survey Department origin of co-ordinates (North 30,000 metres and East 30,000 metres), the boundaries run approximately along successive lines of fences of bearings and distances as under: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 36.1 (partly across a concrete drain) |
| | | | | | | | | | | | to the point of commencement. |
| The boundaries of “KAKI BUKIT CAMP I” are more particularly delineated and edged pink on Survey Plan No. LE/94/29/GAZ filed in the office of the Director, Lands and Estates Organisation, Ministry of Defence, Singapore. |
| | (3) | S 452/95 [6.10.95] General Manager, Caltex Singapore Private Limited |
|
| | CALTEX TANJONG PENJURU INSTALLATION |
| All that areas comprised in Lot Nos. 190 and 193 and in parts of Lot Nos. 191-1, 191-2, 191-3, 2096, 3925, 4207, 4209, 4211, 4213, 4214, 4215, 4964, 5433, 5815 and 5816 occupied by “CALTEX TANJONG PENJURU INSTALLATION” containing an area of approximately 187,274 square metres and bounded approximately as follows: |
| Commencing at the southerly perimeter fence of the aforesaid “CALTEX TANJONG PENJURU INSTALLATION” which point is 31,244.1 metres North and 17,711.4 metres East of the Survey Department origin of co-ordinates, the boundaries run in clockwise manner along successive lines of fence of bearings and distances approximately as under: |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | to the point of commencement and are more particularly delineated in the plan set out hereunder. |
|
|