2. In this Order —| “associated gas‑up and cool down” means the purging of any inert gas, and cooling to cryogenic temperatures, of the LNG fuel storage system of any LNG‑powered ship prior to LNG bunkering; |
| “LNG bunkering” means the supply of LNG, to any LNG‑powered ship within a port, as a fuel used for the operation or propulsion of the ship; |
| “port” means any place in Singapore and any navigable river or channel leading into such place declared to be a port under section 3 of the Maritime and Port Authority of Singapore Act (Cap. 170A). |
|