3.—(1) Sub‑paragraph (2) applies if —| (a) | the Energy Market Authority of Singapore has issued to Senoko Energy Pte. Ltd. a dispatch instruction for not more than 2 specified open cycle gas turbines; and | | (b) | Senoko Energy Pte. Ltd. operates every specified open cycle gas turbine in respect of which a dispatch instruction has been issued (called in this paragraph an activated specified open cycle gas turbine), in accordance with the dispatch instruction. |
(2) Senoko Energy Pte. Ltd. is, in respect of the operation of every activated specified open cycle gas turbine for, or for purposes connected with the production of electricity, exempt from section 12(1) of the Act but only in relation to regulation 4(1) of, read with paragraph 1(q) of the Schedule to, the Environmental Protection and Management (Air Impurities) Regulations (Rg 8) —| (a) | for the period from 21 July 2023 to 31 December 2025 (both dates inclusive); but | | (b) | only if the operation of each activated specified open cycle gas turbine does not result in the emission of oxides of nitrogen of a concentration that before admixture with air, smoke or other gases, exceeds 700 mg/Nm3 expressed as nitrogen dioxide. |
|
|