PART II | SUBMISSION, APPROVAL AND LODGMENT OF PLANS |
[S 854/2023 wef 18/12/2023] | Application for approval of plans of building works |
4.—(1) For the purposes of section 5(1) of the Act, an application for approval of the plans of building works shall be accompanied by the following documents:| (a) | the following plans of the building works prepared in accordance with these Regulations and such other requirements as the Commissioner of Building Control may, from time to time, specify:| (i) | building plans; | | (ii) | detailed structural plans and design calculations; | | (iii) | site formation plans and pile layout plans; [S 250/2008 wef 01/10/2008] | | (iv) | where applicable, civil defence shelter plans; [S 665/2013 wef 01/04/2014] | | (v) | where applicable, geotechnical building works plans; [S 250/2008 wef 01/10/2008] [S 591/2012 wef 01/12/2012] [S 665/2013 wef 01/04/2014] [S 134/2026 wef 01/04/2026] | | (vi) | where applicable, demolition works plans; [S 665/2013 wef 01/04/2014] | | (vii) | where applicable, lightning protection system plans; [S 134/2026 wef 01/04/2026] |
| | (b) | a notification signed by the developer of those building works or the builder of the building works of the appointment of the qualified person who prepared the plans of the building works; [S 54/2008 wef 15/02/2008] | | (c) | where the written permission of the competent authority is required under the Planning Act 1998 in respect of any development of land involving the proposed building works, a copy of the notice of grant of written permission issued by the competent authority or a copy of the lodgment receipt in lieu of written permission issued by the competent authority; [S 709/2017 wef 15/12/2017] [S 579/2022 wef 31/12/2021] | | (d) | where an application has been made under section 6A(1) of the Act for a waiver or modification of any requirement of these Regulations, a copy of the application; [S 54/2008 wef 15/02/2008] | | (e) | where alternative solutions are to be utilised in respect of the building works, a list of the alternative solutions together with the certification of one or more specialists in the alternative solutions referred to in section 9(2)(b)(ii) of the Act, where such certification has been obtained; and [S 54/2008 wef 15/02/2008] [S 665/2013 wef 01/04/2014] | | (f) | such other document as the Commissioner of Building Control may require. [S 54/2008 wef 15/02/2008] |
(2) The application for approval of plans and the documents referred to in paragraph (1)(b), (e) and (f) shall be —| (a) | in such form as may be required by the Commissioner of Building Control; and | | (b) | accompanied by the appropriate fee specified in the Second Schedule. [S 54/2008 wef 15/02/2008] |
|
|
| Lodgment of plans for deemed approval of lodgment works |
4A.—(1) For the purposes of section 5AA(2)(b) of the Act, the plans of any lodgment works —| (a) | must include the following:| (i) | building plans; | | (ii) | detailed structural plans and design calculations; | | (iii) | site formation plans and pile layout plans; | | (iv) | where applicable, civil defence shelter plans; | | (v) | where applicable, demolition works plans; | | (vi) | where applicable, lightning protection system plans; [S 134/2026 wef 01/04/2026] |
| | (b) | must be prepared in accordance with regulations 6 to 11A; and [S 134/2026 wef 01/04/2026] | | (c) | must be prepared in such a manner that the lodgment works, when designed and constructed in accordance with those plans, would comply with —| (i) | the objectives and performance requirements set out in the Fifth Schedule; and | | (ii) | where applicable, the relevant requirements in the technical code entitled “Technical Requirements for Household Shelters” issued by the Commissioner of Civil Defence under section 14 of the Civil Defence Shelter Act 1997, as amended from time to time. |
|
(2) For the purposes of section 5AA(2)(a) of the Act, a lodgment of the plans of any lodgment works must be accompanied by the following documents:| (a) | a notification signed by the developer or the builder of the lodgment works of the appointment of the qualified person who prepared the plans; | | (b) | a certificate by that qualified person stating that the plans are prepared in accordance with paragraph (1)(c); | | (c) | where a written permission of the competent authority is required under the Planning Act 1998 in respect of any development of land involving the proposed lodgment works, a copy of the notice of grant of written permission issued by the competent authority or a copy of the lodgment receipt in lieu of written permission issued by the competent authority; | | (d) | where an application has been made under section 6A(1) of the Act for a waiver or modification of any requirement of these Regulations, a copy of the application. |
|
(3) A lodgment under paragraph (2) must —| (a) | be in the form required by the Commissioner of Building Control; and | | (b) | be accompanied by the appropriate fee specified in the Second Schedule. [S 854/2023 wef 18/12/2023] |
|
|
| Plans of alterations and additions to buildings |
5.—(1) Where any building works consist of repairs, alterations or additions to an existing building and the qualified person who prepared the building plans has reasonable grounds for suspecting that the building works may affect the structural stability or integrity of the building, the building plans mentioned in regulation 4 or 4A (as the case may be) must be accompanied by a certification from an appropriate professional engineer that —| (a) | he has inspected the building and investigated its overall structure; and | | (b) | in his opinion, the building is capable or incapable of resisting the forces and moments which may be increased or altered by reason of the repairs, alterations or additions. [S 854/2023 wef 18/12/2023] |
| (2) Where the qualified person who prepared the building plans referred to in paragraph (1) is a professional engineer in the appropriate discipline, he may provide the certification himself. |
|
| Preparation of plans for approval and lodgment |
6. All plans of building works accompanying any application for approval of the plans under section 5(1) of the Act, amended plans under section 5A(1) of the Act, plans of any lodgment works under section 5AA(1) of the Act, and amended plans of any lodgment works under section 5AB(1)(b)(i) of the Act shall be prepared and signed, or be accompanied by an endorsement signed, by an appropriate qualified person as determined in accordance with the Third Schedule and shall —| (a) | be produced in a clear and intelligible manner; | | (b) | contain project information in the format that the Commissioner of Building Control specifies; [S 854/2023 wef 18/12/2023] | | (c) | distinguish the different types of materials to be used in the building works; [S 854/2023 wef 18/12/2023] | | (d) | contain a full description or generic name in any specification of materials or components given or shown on the plans; [S 854/2023 wef 18/12/2023] | | (e) | demarcate clearly the new building works from the existing building by suitable markings; | | (f) | delineate clearly the building works to be deleted, demolished or removed by suitable markings; | | (g) | if applicable, be numbered serially where the first plan is numbered as 1 of n and the last plan as n of n (n being the total number of pages of the relevant plans); and [S 854/2023 wef 18/12/2023] | | (h) | comply with such other requirements as the Commissioner of Building Control may specify. [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] |
|
| Maximum number of qualified persons to prepare plans of lodgment works |
6A.—(1) The plans mentioned in section 5AA(1) of the Act or amended plans mentioned in section 5AB(1)(b)(i) of the Act for each of the following types of lodgment works must be prepared and signed (or be accompanied by an endorsement signed) by no more than one appropriate qualified person as determined in accordance with the Third Schedule:| (a) | architectural works; | | (b) | structural works. |
| (2) To avoid doubt, the plans mentioned in paragraph (1)(a) and (b) may be prepared and signed (or be accompanied by an endorsement signed) by the same qualified person. [S 854/2023 wef 18/12/2023] |
|
| 7. All plans of building works shall be drawn to the following scales where submitted in paper form: |
| Particulars to be shown on building plans |
8. All building plans shall, where applicable, consist of or contain the following:| (a) | a site plan showing —| (i) | the location and layout of the site with boundary lines clearly verged; [S 854/2023 wef 18/12/2023] | | (ii) | the outline of the building to be erected or building in which building works are to be carried out marked in colour or otherwise; | | (iii) | the north point, or the georeference, and the number of the lot and adjoining lots and the Mukim (MK) or Town Subdivision (TS) number of the lot; [S 854/2023 wef 18/12/2023] | | (iv) | the distance between the new building to be erected or the building works to be carried out and the lot boundary; | | (v) | the retaining wall on the lot; | | (vi) | the existing and proposed platform levels and slopes; and | | (vii) | the ingress and egress to the site; |
| | (b) | the floor plan of each storey including the roof plan of the building containing or showing —| (i) | clear statements indicating the purpose of every room or space in the building; | | (ii) | the types of materials to be used for the main elements of the buildings; | | (iii) | the grid lines or dimensions between columns, corridors, staircase landing and the thickness of walls and columns; | | (iv) | the type of plant, equipment or water tank proposed to be installed and the location of the equipment and every plant room or water tank room; | | (v) | clear statements indicating every part of the building that is to be air-conditioned or mechanically ventilated; | | (vi) | in respect of the first storey, the existing and proposed platform levels of the site and adjoining lots; and | | (vii) | in respect of the first storey, the distance between the new building and the lot boundary; and |
| | (c) | such other details or plans as the Commissioner of Building Control may require. |
|
| Particulars to be shown on detailed structural plans and design calculations |
9.—(1) Without prejudice to regulations 6 and 7, all detailed structural plans shall —| (a) | be in accordance with the provisions of the Act and these Regulations and any other requirement of the Commissioner of Building Control; | | (b) | be signed, or be accompanied by an endorsement signed, by the qualified person who prepared the detailed structural plans and design calculations, and by an accredited checker unless the building works are of a type in respect of which the certificate of an accredited checker referred to in section 5(2)(d)(i) of the Act is not required under regulation 12; [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] | | (c) | bear a certificate from the qualified person who prepared and signed the structural plans on the first and last sheets of the plans stating that he has taken into consideration the loads imposed by all the building works as shown in the building plans or any amendment thereto, or be accompanied by such a certificate; [S 854/2023 wef 18/12/2023] | | (d) | bear a certificate by an accredited checker referred to in section 5(2)(d)(i) of the Act on the first and last sheets of the plans, or be accompanied by such a certificate, unless the building works are of a type in respect of which such a certificate is not required under regulation 12; [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] | | (e) | contain information on the respective area of every floor plan, the imposed load for which the floor system or part thereof has been designed; [S 854/2023 wef 18/12/2023] | | (f) | contain information on the type or types of foundation to be used; [S 854/2023 wef 18/12/2023] | | (g) | contain the specifications of the materials to be used; and | | (h) | contain information on the fixing and framing details of any external cladding and safety barriers against falling from a height (if applicable). [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] |
(2) The design calculations shall be prepared in such format and manner as the Commissioner of Building Control may require and shall —| (a) | contain a contents page; | | (b) | be signed and endorsed, or be accompanied by an endorsement signed, by the qualified person who prepared the detailed structural plans and design calculations; [S 665/2013 wef 01/04/2014] [S 854/2023 wef 18/12/2023] | | (c) | bear a certificate by the qualified person who prepared the detailed structural plans and design calculations on the first and last sheets of the calculations stating that, to the best of his knowledge and belief, the design calculations have been prepared in accordance with these Regulations and that he is the person who prepared the design calculations, or be accompanied by such a certificate; [S 854/2023 wef 18/12/2023] | | (d) | state in the certificate of the qualified person referred to in sub-paragraph (c) the number of pages per book and a numbering of every page in the book; [S 854/2023 wef 18/12/2023] | | (e) | contain a Design Information Sheet giving a summary of the design information including, where applicable, the design loads, codes of practice, assumptions, soil investigation report, foundation system, wind loads and other information relevant to the design in question; | | (f) | contain a Structural Summary Sheet showing the structural system, the form of the structure, the key structural elements, the provision for overall stability and structural analysis; | | (g) | contain a Grouping of Structural Elements Sheet containing a list of designed structural elements that are similar; and [S 598/2004 wef 01/10/2004] | | (h) | contain an Analysis and Design of Structural Elements Sheet showing the detailed design and calculations of —| (i) | the foundation; | | (ii) | the shearwall, corewall and all structural elements resisting horizontal forces; | | (iii) | the column and all vertical load bearing structural elements; | | (iv) | the transfer beams or plates, cantilevers, pre-stressed beams and flat slabs; | | (v) | the space truss and portal frame; | | (vi) | any shaft, tunnel or connections, or cavern structure; [S 54/2008 wef 15/02/2008] | | (vii) | the retaining walls and supporting structures; and [S 54/2008 wef 15/02/2008] | | (viii) | the overall structural system under wind loads, if applicable. [S 54/2008 wef 15/02/2008] |
|
|
(3) Where a computer programme is used in the design calculations —| (a) | the details of the programme including assumptions, limitations and the like shall be explained by the qualified person in his submission; and | | (b) | the inputs and outputs from the programme shall be endorsed and submitted by the qualified person and shall form part of the design calculations submitted by him. |
|
| (4) The certificates referred to in paragraphs (1)(c) and (d) and (2)(c) shall be in such form as the Commissioner of Building Control may specify. |
|
| Particulars to be shown on site formation plans and pile layout plans |
10.—(1) Without prejudice to regulations 6 and 7, all site formation plans and calculations shall —| (a) | be in accordance with the provisions of the Act and these Regulations and any other requirement of the Commissioner of Building Control; | | (b) | show the contour lines at intervals of 500 mm in height or contain information on the spot levels of the existing site and adjoining lands drawn with reference to the ordnance datum; [S 854/2023 wef 18/12/2023] | | (c) | contain information on the location of the site formation works; [S 854/2023 wef 18/12/2023] | | (d) | contain information on the finished formation levels, including platform level for the building or buildings and the finished road levels; [S 854/2023 wef 18/12/2023] | | (e) | show the slope of any excavation or filling exceeding 1500 mm in depth; and | | (f) | contain information on the means of protecting the site formation works against erosion, earthslip, slope failure or instability. [S 854/2023 wef 18/12/2023] |
(2) The pile layout plans shall contain information on —| (a) | the types of piles and the specification of materials to be used; | | (b) | the location of piles and site investigation boreholes; [S 54/2008 wef 15/02/2008] | | (c) | the estimated pile penetration depth for each design zone; [S 54/2008 wef 15/02/2008] | | (d) | the minimum embedded pile length into competent stratum, where applicable; [S 54/2008 wef 15/02/2008] | | (e) | the unit skin friction and unit end bearing resistance for pile designs; [S 54/2008 wef 15/02/2008] | | (f) | the allowable pile bearing capacity before and after deduction of negative skin friction (if applicable) and details of pile joints; [S 54/2008 wef 15/02/2008] | | (g) | the allowable total and differential foundation settlement; [S 54/2008 wef 15/02/2008] | | (h) | the allowable vibration limit during pile installation; and [S 54/2008 wef 15/02/2008] | | (i) | the sectional details of piles and number and type of pile load tests and the location of ultimate pile load tests. [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] |
|
|
| Particulars to be shown in geotechnical building works plans |
10A.—(1) The geotechnical building works plans referred to in regulation 4(1)(a) shall consist of or contain the following, where applicable:| (a) | plans of any tunnelling support system; | | (b) | plans of any excavation and earth retaining structures; | | (ba) | plans for constructing or stabilising any slope; [S 591/2012 wef 01/12/2012] | | (c) | plans of the foundation; | | (d) | instrumentation and monitoring plans. [S 591/2012 wef 01/12/2012] |
(2) Without prejudice to regulations 6, 7 and 8, all geotechnical building works plans shall —| (a) | be in accordance with the provisions of the Act and these Regulations and any other requirement of the Commissioner of Building Control; | | (b) | be signed and endorsed, or be accompanied by an endorsement signed, by the qualified person who prepared the plans and calculations, and by the appropriate accredited checker; [S 854/2023 wef 18/12/2023] | | (c) | bear a certificate by the qualified person who prepared the plans on the first and last sheets of the calculations stating that, to the best of his knowledge and belief, the design calculations have been prepared in accordance with these Regulations and that he is the person who prepared the design calculations, or be accompanied by such a certificate; [S 854/2023 wef 18/12/2023] | | (d) | state in the certificate of the qualified person referred to in sub-paragraph (c) the number of pages per book and a numbering of every page in the book; [S 854/2023 wef 18/12/2023] | | (e) | be accompanied by an Information Sheet giving a summary of the key design and construction information including, where applicable, load conditions, codes of practice, assumptions, earth-retaining system, tunnel support system, foundation system, and other information relevant to the design and construction in question; | | (f) | be accompanied by an impact assessment report on neighbouring structures and a site investigation report; | | (g) | be accompanied by a geotechnical report which shall contain —| (i) | a summary to highlight the key elements of the design and the issues addressed; | | (ii) | evaluation and interpretation of existing information and investigation and monitoring results; | | (iii) | assessment of geotechnical parameters and groundwater conditions; | | (iv) | geotechnical assumptions, analysis, design and calculations; | | (v) | geotechnical requirements relating to the design and construction of the geotechnical building works including testing, validating, controlling, inspecting and monitoring; [S 591/2012 wef 01/12/2012] | | (vi) | geotechnical reviews; and | | (vii) | any other details as the Commissioner of Building Control may require; and |
| | (h) | be accompanied by such other reports as the Commissioner of Building Control may require. [S 591/2012 wef 01/12/2012] |
|
(3) The plans of a tunnel support system for the design and construction of any tunnel with diameter, width or height of more than 2 metres shall contain, where applicable —| (a) | layout, sections and details of all excavation and tunnel support works showing —| (i) | subsurface information including plan showing layout of investigation boreholes and subsurface profile along each tunnel axis; | | (ii) | maximum depth, and extent of excavation at each stage including heading, bench and invert; | | (iii) | face pressure and other key performance indicators for ensuring stability of tunnel during construction; | | (iv) | location of planned stoppages and necessary ground improvement and monitoring details; and | | (v) | profile and the nature of the site and its surrounds including ground topography, neighbouring structures, subsurface geological and geotechnical data, and groundwater conditions; |
| | (b) | layout, sections, details and material specifications of tunnel support elements and structures, tunnel face support system and overall tunnel support system and other structural elements showing types, sizes and material specifications of members to be used and the connection details; | | (c) | layout, sections and details of earth or ground strengthening, improvement or protection works including layout, sections and sizes of all elements, material specifications, details of inspections and tests to be carried out; | | (d) | method and sequence of construction including duration and spatial limits of critical activities; | | (e) | details of inspections and tests to be carried out; | | (f) | details of any special precautions, groundwater control measures, control and protective measures required during excavation, installation and removal of any tunnel support element; | | (g) | other specifications and relevant particulars; and | | (h) | such other details as the Commissioner of Building Control may require. |
|
(4) The plans of any excavation and earth retaining structures, or plans for constructing or stabilising any slope, in relation to any geotechnical building works shall contain, where applicable —| (a) | layout, sections and details of all excavation and earth retaining works showing —| (i) | subsurface information including plan showing layout of investigation boreholes and surface profile along and across the excavation boundary; | | (ii) | maximum depth, and extent of excavation at each stage; and | | (iii) | profile and the nature of the site and its surrounds including ground topography, neighbouring structures, subsurface geological and geotechnical data, and groundwater conditions; |
| | (b) | layout, sections, details and material specifications of earth retaining elements and structures, wall elevation showing the wall founding depth or penetration depth or minimum wall embedment requirement, and overall retaining system; | | (c) | layout, sections and details of struts, anchors, soil nails, walers, king posts, bracings, corbels and other structural elements showing types, sizes and material specifications of members to be used, connection details, and where appropriate, inspections and tests to be carried out; | | (d) | layout and sections of earth berms or slope showing type of soils, size and location of berms, internal and external drainage provisions and protection measures including against surface weathering; | | (e) | layout, sections and details of earth or ground strengthening, improvement or protection works including layout, sections and sizes of all elements, material specifications, details of inspections and tests to be carried out; | | (f) | layout, sections and details of permanent support system to the earth retaining system showing details of lateral bracing element, and connection details; | | (g) | method and sequence of construction including duration and spatial limits of critical activities; | | (h) | details of inspections and tests to be carried out; | | (i) | details of any special precautions, groundwater control measures, control and protective measures required during excavation, and installation and removal of any earth retaining element; | | (j) | other specifications and relevant particulars; and | | (k) | such other details as the Commissioner of Building Control may require. [S 591/2012 wef 01/12/2012] |
|
(5) The foundation plans for the design and construction of foundation for buildings of 30 or more storeys shall contain, where applicable —| (a) | the layout, sections and details of all foundation works showing —| (i) | types of piles or foundation and specification of material to be used; | | (ii) | location of piles or foundation and site investigation boreholes; | | (iii) | pile or foundation founding depth or pile minimum embedment into competent stratum for each pile or foundation; | | (iv) | unit shaft friction, pile base resistance or foundation bearing pressure; | | (v) | allowable foundation capacity before and after accounting for negative skin friction where applicable, allowable tension, and lateral load; | | (vi) | details of pile reinforcements, pile joints, connection with pilecap, pile shops; | | (vii) | allowable total and differential foundation movement; and | | (viii) | allowable vibration limit; and |
| | (b) | the number, type of pile or foundation tests, structural integrity tests and location of preliminary test pile or ultimate load tests and site investigation for the tests. |
|
(6) The instrumentation and monitoring plans shall contain, where applicable —| (a) | layout and location of neighbouring structures in relation to the geotechnical building works; [S 591/2012 wef 01/12/2012] | | (b) | numbers, types, locations, details and other particulars of instruments for monitoring forces and movement of structural elements, building and ground movements, and variations in the groundwater or piezometric levels; | | (c) | frequency and duration of monitoring; | | (d) | allowable ground or building movement limits; | | (e) | allowable vibration limits; | | (f) | where applicable, long-term instrumentation, monitoring and maintenance requirements; | | (g) | other specifications and relevant particulars; and | | (h) | such other details as the Commissioner of Building Control may require. [S 250/2008 wef 01/10/2008] [S 591/2012 wef 01/12/2012] |
|
|
| Particulars to be shown in demolition works plans |
10B.—(1) The demolition works plans referred to in regulations 4(1)(a)(vi) and 4A(1)(a)(v) shall consist of or contain such of the following as may be applicable:| (a) | demolition plans; | | (b) | instrumentation and monitoring plans. [S 854/2023 wef 18/12/2023] |
(2) Without prejudice to regulations 6, 7, 8 and 9, all demolition works plans shall —| (a) | be in accordance with the provisions of the Act and these Regulations and any other requirement of the Commissioner of Building Control; and | | (b) | be accompanied by —| (i) | an impact assessment report on neighbouring structures, which shall include design calculations showing the stability and adequacy of every structural element the structural continuity of which is to be truncated by the demolition works; | | (ii) | design calculations showing that the floor is capable of resisting —| (A) | the load from the debris; or | | (B) | where a demolition machine is intended to be placed on the floor of the building in accordance with the demolition works plans, the load from the demolition machine and the debris; and |
| | (iii) | such reports as the Commissioner of Building Control may require. |
|
|
(3) Each demolition plan shall contain such of the following as may be applicable:| (a) | the location and site plan of the building to be demolished, which includes the distances between the building to be demolished and adjacent buildings which are not to be demolished; | | (b) | structural floor plans showing or containing information on —| (i) | in respect of each area of each floor plan, the imposed load for which the floor system or part thereof has been designed; | | (ii) | the demolition sequence and demolition zone for each floor; | | (iii) | the method statement on the handling and disposal of debris; | | (iv) | the type and weight of the demolition machine; and | | (v) | the location of the temporary ramp; [S 854/2023 wef 18/12/2023] |
| | (c) | a layout plan showing or containing information on the demolition sequence of —| (i) | all beams; | | (ii) | all columns; | | (iii) | all walls; | | (iv) | all slabs; and | | (v) | all edge parapets; [S 854/2023 wef 18/12/2023] |
| | (d) | the following information on safety and environmental protection measures:| (i) | layout plan, details, material specifications and elevation view of shoring and temporary supports; | | (ii) | layout plan, details and material specifications of protective hoardings, covered walkways, catch platform, catch fans, scaffolding, protective screens and safety nets; | | (iii) | where a demolition machine is used, the route of safe movement of the demolition machine; | | (iv) | where a continuous beam extends from the building to be demolished to an adjacent building and the beam is to be cut off at the boundary of the buildings, the anchorage detail of the existing reinforcement bars of the beam where it is to be cut off. |
|
|
(4) Each instrumentation and monitoring plan shall contain such of the following as may be applicable:| (a) | the layout and location of other buildings (that are not to be demolished) in relation to the building to be demolished; | | (b) | the number, types, location, details and other particulars of instruments for monitoring building and ground movements; | | (c) | the frequency and duration of monitoring; | | (d) | allowable vibration limits; | | (e) | the location of closed‑circuit television cameras to monitor the progress of the demolition work, especially for demolition of high‑rise buildings. [S 665/2013 wef 01/04/2014] |
|
|
| Particulars to be shown on civil defence shelter plans |
11.—(1) The civil defence shelter plans referred to in regulations 4(1)(a)(iv) and 4A(1)(a)(iv) shall consist of —| (a) | civil defence shelter building plans; | | (b) | civil defence shelter structural plans; and | | (c) | in the case of public shelters —| (i) | civil defence shelter mechanical plans; | | (ii) | civil defence shelter electrical plans; and | | (iii) | civil defence shelter shock design plans. [S 854/2023 wef 18/12/2023] |
|
(2) Without prejudice to regulations 6 and 7, all civil defence shelter plans shall —| (a) | be signed, or be accompanied by an endorsement signed, by the qualified person who prepared the plans; [S 854/2023 wef 18/12/2023] | | (b) | bear a certificate on the first and last sheets of the plans, or be accompanied by a certificate, from the qualified person stating that —| (i) | the plans have been prepared in accordance with these Regulations; and | | (ii) | the plans have been prepared in such a manner that the household shelter, public shelter or storey shelter, when designed and constructed in accordance with those plans, would comply with these Regulations and the relevant technical requirements under the Civil Defence Shelter Act 1997; and [S 854/2023 wef 18/12/2023] |
| | (c) | be accompanied by design calculations and the relevant technical documents showing the details of the mounting brackets, expansion anchor bolts and shock isolators, where applicable. |
|
| (3) All design calculations shall be signed by the qualified person who prepared the calculations and either bear a certificate referred to in paragraph (2)(b) on the first and last sheets of the calculations or be accompanied by such a certificate. [S 854/2023 wef 18/12/2023] |
(4) The civil defence shelter building plans of a household or storey shelter shall contain —| (a) | a site plan; | | (b) | the floor plans, sections and elevations containing information on —| (i) | the shelter type, gross floor area of each dwelling type and size and number of each type; | | (ii) | the location and layout in relation to the overall building with the outline of the shelters marked; and | | (iii) | the setback distances of shelter walls and shelter dimensions; [S 854/2023 wef 18/12/2023] |
| | (c) | the details showing the location of the blast door, ventilation openings and fixtures such as power-points, lighting points, telephone points and radio and television antenna outlets in the shelter; | | (d) | the schematic details showing the routing and penetration of service conduits in the shelter; and | | (e) | such other details as the Commissioner of Building Control may require. |
|
(5) The civil defence shelter building plans of a public shelter shall contain floor plans, sections and elevations containing information on —| (a) | the bounds of protection; | | (b) | the details, layout and dimensions of the main shelter area, auxiliary areas, plant rooms, generator room, water tanks (including their capacity), air locks, access ways, entrances and exits; | | (c) | the locations and overall dimensions of protective blast doors, hatches, blast valves, sealing devices, louvres and gas-tight doors; and | | (d) | such other details as the Commissioner of Building Control may require. [S 854/2023 wef 18/12/2023] |
|
(6) The civil defence shelter structural plans of a household shelter or storey shelter shall contain —| (a) | the floor plans indicating the shelter; | | (b) | the vertical and horizontal sections through the shelter tower and an indication of the structural dimensions and reinforcement details; | | (c) | the cross sectional details of openings such as the blast door opening, ventilation openings and services penetrations; and | | (d) | such other details as the Commissioner of Building Control may require. |
|
(7) The civil defence shelter structural plans of a public shelter shall contain —| (a) | pile layout plans showing —| (i) | the types of piles; | | (ii) | the location of piles; and | | (iii) | the column loads including collapse load; |
| | (b) | structural plans showing —| (i) | the floor plans indicating the public shelter; | | (ii) | the details of structural elements with sections; | | (iii) | the imposed loading for the structural floor system; | | (iv) | the details of reinforcement around openings for doors, hatches, ventilation and services penetrations; | | (v) | the specification of materials; | | (vi) | the types of foundation, where applicable; and | | (vii) | the minimum allowable soil bearing capacity, where applicable; and |
| | (c) | such other details as the Commissioner of Building Control may require. |
|
(8) The civil defence shelter mechanical plans of a public shelter shall contain —| (a) | the air-conditioning and mechanical ventilation plans; | | (b) | the water supply and reticulation plans; | | (c) | the sanitary and drainage plans; and | | (d) | such other details as the Commissioner of Building Control may require. |
|
(9) The civil defence shelter electrical plans of a public shelter shall contain —| (a) | the power and lighting plans; | | (b) | the communications plans; | | (c) | the generator system plans; and | | (d) | such other details as the Commissioner of Building Control may require. |
|
(10) The civil defence shelter shock design plans of a public shelter shall contain —| (a) | the shock design plans; | | (b) | the calculations for the support system of every architectural fixture and mechanical and electrical equipment and services; and | | (c) | such other details as the Commissioner of Building Control may require. |
|
| (11) The certificate referred to in paragraph (2)(b) shall be in such form as the Commissioner of Building Control may specify. |
|
| Particulars to be shown on lightning protection system plans |
11A.—(1) The lightning protection system plans mentioned in regulations 4(1)(a)(vii) and 4A(1)(a)(vi) must specify the class of lightning protection system and where applicable, consist of or contain the following:| (a) | a site plan containing or showing —| (i) | the location and layout of the site with boundary lines clearly verged; | | (ii) | the outline of the building to be erected or building in which building works are to be carried out marked in colour or otherwise; | | (iii) | the north point, or the georeference, and the number of the lot and adjoining lots and the Mukim (MK) or Town Subdivision (TS) number of the lot; | | (iv) | the distance between the new building to be erected or the building works to be carried out and the lot boundary; | | (v) | any retaining wall on the lot; | | (vi) | any existing and proposed platform level and slope; and | | (vii) | the ingress and egress to the site; |
| | (b) | the roof plan of the building containing or showing —| (i) | the air-termination system; and | | (ii) | the location of the down conductors; |
| | (c) | one or more elevation plans containing or showing —| (i) | the zones of lightning protection provided by the air-termination network for the open roof spaces and the sides of the building; and | | (ii) | the location of the down conductors; |
| | (d) | the floor plan of each storey where the earth electrodes are located; | | (e) | one or more plans containing or showing —| (i) | the details and the location of the points where there is equipotential bonding between the air-termination system, down-conductor system and earth-termination system; and | | (ii) | the details and the location of the points where there is equipotential bonding of the lightning protection system to electrically conductive parts of the building (except mechanical and electrical services); |
| | (f) | such other details or plans as the Commissioner of Building Control may require. |
(2) Without affecting regulations 6 and 7, all lightning protection system plans must —| (a) | be in accordance with the provisions of the Act and these Regulations and any other requirement of the Commissioner of Building Control; | | (b) | be signed, or be accompanied by an endorsement signed, by the qualified person who prepared the lightning protection system plans; and | | (c) | bear a certificate from the qualified person who prepared the lightning protection system plans stating that the plans have been prepared in accordance with the Act and these Regulations, or be accompanied by such certificate. |
|
[S 134/2026 wef 01/04/2026] |
| 12. The building works specified in the Fourth Schedule are building works the plans of which do not require a certification from an accredited checker for the purposes of section 5 or 5A of the Act. [S 54/2008 wef 15/02/2008] |
| Non-acceptance of application for approval of plans |
13. The Commissioner of Building Control may refuse to accept an application for approval of any plans of building works if —| (a) | the application or the plans of building works submitted do not comply with any requirement of the Act or these Regulations; | | (b) | the application is not complete or not in accordance with any other requirement of the Commissioner of Building Control; or | | (c) | the appropriate fee specified in the Second Schedule has not been paid. [S 54/2008 wef 15/02/2008] |
|
| Approval and deemed approval of plans |
| 14.—(1) Where the Commissioner of Building Control approves any plans of building works under section 5(3)(a) of the Act, he shall notify the developer of the building works and the qualified person who prepared and submitted those plans of his approval and of the terms and conditions, if any, subject to which the approval has been granted. [S 54/2008 wef 15/02/2008] (2) For the avoidance of doubt, no approval of any plans of building works under section 5(3)(a) of the Act, or deemed approval of any plans of lodgment works under section 5AA(1) of the Act, shall be taken to —| (a) | confer any title to land; | | (b) | act as a waiver of any term in any lease or licence; | | (c) | grant any exemption from or permit any contravention of any provision of these Regulations; or | | (d) | waive or modify the application of these Regulations to those building works where no such waiver or modification has been granted under section 6A(1) of the Act in relation to the building works. [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] [S 854/2023 wef 18/12/2023] |
|
|
| 15. Where the Commissioner of Building Control disapproves any plans of building works under section 5(3)(c) of the Act, he shall notify the developer of the building works and the qualified person who prepared and submitted those plans. [S 54/2008 wef 15/02/2008] [S 709/2017 wef 15/12/2017] |
| Return of disapproved or withdrawn plans |
16.—(1) Where any plans of building works have been disapproved, the Commissioner of Building Control may return the disapproved plans to the qualified person. | (2) Where any plans have been withdrawn by the qualified person or developer before or after approval, the Commissioner of Building Control may return the plans to the qualified person or developer, as the case may be. [S 54/2008 wef 15/02/2008] |
| (3) Where the Commissioner of Building Control has notified a qualified person or developer to collect any plans (whether on paper or in electronic form) that are to be returned under paragraph (1) or (2), and such plans are not collected within one month from the date of the notice, the Commissioner of Building Control may destroy or dispose of the plans (including the medium in which they are stored) in any way he thinks fit. [S 54/2008 wef 15/02/2008] |
|
17.—(1) Any fee paid to the Commissioner of Building Control under these Regulations is not refundable.| (2) Despite paragraph (1), the Commissioner of Building Control may, in his or her discretion, refund in whole or in part, any fee paid under these Regulations. [S 854/2023 wef 18/12/2023] |
|
| Requirements for deviation from approved plans |
| 18.—(1) Where it is desired that any building works deviate from the approved plans of those building works, an application shall be made to the Commissioner of Building Control under section 5A(1) of the Act and shall, without prejudice to that section, be accompanied by the amended plan of the buildings works showing clearly the departures or deviations. [S 54/2008 wef 15/02/2008] | (2) Where the deviations involve material changes to the structural design, the qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act and, in the case of major building works, the accredited checker shall submit the structural plans and design calculations to the Commissioner of Building Control for approval before construction. [S 54/2008 wef 15/02/2008] |
| (2A) Where the deviations involve material changes to building works other than the structural design, the qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act shall submit the building plans to the Commissioner of Building Control for approval before construction. [S 665/2013 wef 01/04/2014] |
(3) Notwithstanding paragraph (1), where the departures or deviations involve immaterial changes to the structural design, the qualified person appointed under section 8(1)(a) or 11(1)(d)(i) shall only be required to prepare and submit to the Commissioner of Building Control —| (a) | the record plans; | | (b) | his certificate stating that to the best of his knowledge and belief the departures or deviations do not affect the structural adequacy or stability of the building; | | (c) | a certificate from an accredited checker stating that to the best of his knowledge and belief, the record plans do not show any inadequacy in key structural elements of the building to be erected or affected by building works carried out in accordance with those plans; and | | (d) | on the completion of the building works, a report stating the departures and deviations accompanied by the detailed structural plans and design calculations showing such departures and deviations. [S 54/2008 wef 15/02/2008] [S 665/2013 wef 01/04/2014] |
|
(3A) Notwithstanding paragraph (1), where the departures or deviations involve immaterial changes to building works other than the structural design, the qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act shall only be required to prepare and submit to the Commissioner of Building Control —| (a) | the record plans; | | (b) | his certificate stating that to the best of his knowledge and belief, the departures or deviations —| (i) | have been completed in accordance with the provisions of the Act and these Regulations; and | | (ii) | do not affect the objectives and performance requirements set out in the Fifth Schedule relating to the approved plans; and |
| | (c) | such other certificate or document as may be required by the Commissioner of Building Control. [S 665/2013 wef 01/04/2014] |
|
| (4) The qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act shall keep and maintain a record of all departures and deviations relating to the structural elements of the building works. [S 54/2008 wef 15/02/2008] |
| (5) The certificates referred to in paragraphs (3)(b) and (c) and (3A)(b) and (c) shall be in such form as the Commissioner of Building Control may specify. [S 665/2013 wef 01/04/2014] |
| (6) Every application under section 5A(1) of the Act must be accompanied by the appropriate fee specified in the Second Schedule. [S 443/2017 wef 10/09/2017] [S 854/2023 wef 18/12/2023] |
|
| Requirements for deviation from lodged plans |
18A.—(1) This regulation applies to a lodgment of amended plans of lodgment works mentioned in section 5AB(1)(b)(i) of the Act.(2) Where the departure or deviation from the initial plans involves a material change to the lodgment works, the developer of the lodgment works must lodge with the Commissioner of Building Control —| (a) | the plans of the lodgment works showing such departure or deviation; and | | (b) | if the departure or deviation involves material changes to the structural design, the structural plans and design calculation showing such departure or deviation. |
|
(3) Where the departure or deviation involves only an immaterial change to the lodgment works, the developer of the lodgment works is only required to submit to the Commissioner of Building Control —| (a) | the record plans; | | (b) | a certificate by the qualified person who prepared the amended plans stating that to the best of the qualified person’s knowledge and belief, the departure or deviation —| (i) | has been completed in accordance with the provisions of the Act and these Regulations; and | | (ii) | does not affect the objectives and performance requirements set out in the Fifth Schedule relating to the deemed approved plans; |
| | (c) | if the departure or deviation involves an immaterial change to the structural design, all of the following documents:| (i) | a certificate by the qualified person who prepared the amended plans stating that to the best of the qualified person’s knowledge and belief, the departure or deviation does not affect the structural adequacy or stability of the building; | | (ii) | on the completion of the lodgment works, a report stating the departure or deviation together with the detailed structural plans and design calculations showing such departure or deviation; and |
| | (d) | such other certificate or document as may be required by the Commissioner or Building Control. |
|
| (4) Every lodgment under paragraph (1) must be accompanied by the appropriate fee specified in the Second Schedule. [S 854/2023 wef 18/12/2023] |
|
| Validity period of approval or deemed approval |
| 19. For the purposes of section 5B(1)(c) of the Act, the approval or deemed approval of any plans of building works granted by the Commissioner of Building Control shall lapse if the building works are not commenced within 24 months from the date of approval or deemed approval, as the case may be. [S 54/2008 wef 15/02/2008] [S 854/2023 wef 18/12/2023] |
| Application for modification or waiver of building regulations |
| 20.—(1) Where any proposed building works shown in any plans do not comply with the provisions of these Regulations relating to the design and construction of buildings, the developer or an appropriate qualified person appointed by him shall make an application under section 6A(1) of the Act. [S 54/2008 wef 15/02/2008] | (2) For the purposes of section 6A(2) of the Act, any such application shall be accompanied by a declaration signed by an appropriate qualified person stating every item of the building works shown in the plans that does not comply with the provisions of these Regulations relating to design and construction. [S 54/2008 wef 15/02/2008] |
| (3) Every application under section 6A(1) of the Act shall be accompanied by the appropriate fee specified in the Second Schedule. [S 549/2005 wef 01/09/2005] [S 54/2008 wef 15/02/2008] |
|
| Permit to carry out structural works |
| 21.—(1) An application for a permit to carry out any structural works (including piling or site formation works or the demolition of a building) under section 6(1) of the Act shall be in such form as the Commissioner of Building Control may require. [S 54/2008 wef 15/02/2008] | (2) Where any part of a building under construction or undergoing alteration is to be demolished, no separate permit for the demolition works shall be required. |
(3) For the purposes of section 6(2)(e) of the Act, an application for a permit to carry out any demolition of a building shall be accompanied by —| (a) | a method statement detailing how the demolition works are to be carried out; and | | (b) | an impact assessment report on surrounding buildings. [S 54/2008 wef 15/02/2008] |
|
(4) For the purposes of section 6(2)(e) of the Act, an application for a permit to carry out any piling or site formation works shall be accompanied by —| (a) | an impact assessment report on surrounding buildings and other structures; and | | (b) | a notification specifying the date of commencement of the piling or site formation works. [S 54/2008 wef 15/02/2008] |
|
|
|